Accurately recording the condition of a property at a specific point in time, often used in lease agreements or prior to construction works.

Do I need a schedule of condition before I sign a lease?

If the building is older or already shows wear, almost certainly. Commercial leases often carry full repairing obligations, which can leave a tenant required to hand back a property in better condition than they took it. A schedule properly referenced in the lease limits your liability to leaving it no worse than it was recorded on day one.

What is the difference between a building survey and a schedule of condition?

A building survey investigates and advises. A schedule of condition records — in words and photographs — the state of the property on a given date, so that it can be attached to a lease as the benchmark for what the tenant must hand back.

Can a tenant limit dilapidations before the lease even starts?

Yes, and it is the single most effective step. A schedule of condition records the state of the property in words and photographs on the day the lease begins. Where the lease refers to it, the tenant need not hand the property back in any better condition than the schedule shows — so defects that were already there cannot be claimed for at the end. It costs a fraction of the claims it prevents. Our building surveyors prepare them.

Survo in numbers
100%

value our professionalism, personal service, expertise and knowledge

42

postcode areas across the UK where we have been instructed

Very happy with the service and communication is excellent
M.T.Survo client

Survey figures are from recent client surveys. Postcode areas are from recent instructions.

How we work

Every instruction is different.
The method is not.

  1. 01

    You get in touch

    Send the outline or call the office. A chartered surveyor reads it — there is no form queue and no account manager in between.

    Reply within 48 hours
  2. 02

    We agree the fee

    Scope and fee confirmed in writing, so the number you were quoted is the number on the invoice.

    Before any work starts
  3. 03

    We establish the facts

    Laser-measured and photographed on site where the work needs it; read off the lease, the accounts and the evidence where it does not.

    Recorded, not estimated
  4. 04

    You get the position in writing

    What matters, what it costs and what can safely wait — with the next steps set out in the order we would take them.

    Plain English, and practical
  5. 05

    We see it through

    Notice served, negotiation run, works overseen. The measure is the outcome, not the report — whether the instruction concludes or continues.

    Through to completion

One partner, from first call to final report

Ask us about schedules of condition

Send the outline and the right surveyor replies — usually within 48 hours.

Start an enquiry