Dilapidations for Tenants
We advise on the validity, scope, and cost (quantum) of the landlord’s claim, providing robust analysis and guidance on statutory protections. Our aim is to reduce liability and ensure you only pay what is genuinely owed.
What is a schedule of dilapidations?
The landlord’s list of the breaches it says exist, the work needed to put each right, and the cost. A terminal schedule is served around the end of the lease; an interim schedule can be served during the term. It is the opening position in a negotiation, not an invoice.
Do I have to pay what the landlord is claiming?
Not automatically. Each item has to be a real breach of the lease, and the cost has to be reasonable. For disrepair, the law also caps damages at the amount by which the breaches have reduced the value of the landlord’s interest — and where the landlord intends to demolish or substantially alter the building at the end of the lease, damages for the disrepair may not be recoverable at all.
Can a tenant limit dilapidations before the lease even starts?
Yes, and it is the single most effective step. A schedule of condition records the state of the property in words and photographs on the day the lease begins. Where the lease refers to it, the tenant need not hand the property back in any better condition than the schedule shows — so defects that were already there cannot be claimed for at the end. It costs a fraction of the claims it prevents. Our building surveyors prepare them.
When should I start dealing with dilapidations?
Well before the lease ends. A tenant who knows the likely liability a year or more ahead can choose between doing the work and negotiating a payment, and can budget for either. A landlord who inspects early can serve a schedule in good time and re-let without a gap.
value our professionalism, personal service, expertise and knowledge
postcode areas across the UK where we have been instructed
Very happy with the service and communication is excellent
Survey figures are from recent client surveys. Postcode areas are from recent instructions.
Every instruction is different.
The method is not.
- 01
You get in touch
Send the outline or call the office. A chartered surveyor reads it — there is no form queue and no account manager in between.
Reply within 48 hours - 02
We agree the fee
Scope and fee confirmed in writing, so the number you were quoted is the number on the invoice.
Before any work starts - 03
We establish the facts
Laser-measured and photographed on site where the work needs it; read off the lease, the accounts and the evidence where it does not.
Recorded, not estimated - 04
You get the position in writing
What matters, what it costs and what can safely wait — with the next steps set out in the order we would take them.
Plain English, and practical - 05
We see it through
Notice served, negotiation run, works overseen. The measure is the outcome, not the report — whether the instruction concludes or continues.
Through to completion
One partner, from first call to final report
Ask us about dilapidations for tenants
Send the outline and the right surveyor replies — usually within 48 hours.
Start an enquiry